Septic, Roof, Steel Studs, Basement work

Excavation and preparation for the Spetic System started today.  The roof was started leaving room for rooftop HVAC units.  Stratford Dental office space is taking shape with the steel studs being placed.  The basement plumbing rough-ins are ongoing and the fire proofing throughout the entire building has been completed.


Septic System excavation started
Roof started
South side exterior
Steel studs in Stratford Dental space